Administrative Installation Building - Los Angeles 

The client was looking to reconfigure and redesign their central campus, located on 60 acres of land. archimania developed a feasibility study and master plan to determine the relocation, consolidation, and upgrades needed for the site’s various components, including a Central Control Room, lab, storages facility, field shelter, and administrative offices. The final master plan phases the project components over time to ease any interruptions to the refinery’s daily operations. The plan’s implementation will result in a more unified campus, with enhanced workflow and increased efficiency. The Control Center is pursuing LEED certification.

© 2017 archimania  /  All rights reserved.

Top